Customer Story
Hart Lifts
Discover how a family-run Scottish elevator service company uses FIELDBOSS to streamline scheduling, accelerate onboarding, and improve client transparency across a ~1,500 lift portfolio.
THE CHALLENGE
As a family-run team responsible for over 1,500 lifts across residential, commercial, and hospitality sites, Hart Lifts was growing faster than its tools. The legacy, office-bound system created friction exactly where speed and clarity mattered most—scheduling, onboarding, and client updates. Coordinators lacked a live picture of engineer availability, proof was stored in email threads, and setting up new sites took longer and was more complex than the customers wanted. The result was lost time to administration, slower responses, and too much back-and-forth for everyone.
Where the friction showed up
- Access & responsiveness: Remote access was limited, creating office dependency and delays.
- Scheduling clarity: No clear view of the engineer’s day or simple drag‑and‑drop made monthly PM planning time-consuming and challenging.
- Proof in context: Photos and attachments lived outside the job record (shared by email), weakening evidence and handoffs.
- New‑site mobilization: Onboarding new buildings/devices could take days and often required vendor involvement.
- Planning data: The data was cumbersome to extract quickly for short-term forecasting and workload planning.
Taken together, these constraints pushed Hart Lifts to seek a true cloud platform with flexible scheduling, embedded job evidence, and fast setup—leading them to FIELDBOSS.
WHY HART LIFTS CHOSE FIELDBOSS
After an extensive market review, Hart Lifts selected FIELDBOSS for its cloud flexibility, modern scheduling, and rapid mobilization, all in a single platform that didn’t require extensive customizations.
- True cloud platform for anywhere access and hybrid work across the team.
- Flexible schedule board with drag‑and‑drop, mechanic day views, and routing to simplify PM planning and callouts.
- Built‑in job evidence (photos, notes, equipment/parts status) and visit reports to improve client transparency.
- Rapid onboarding allows new buildings/devices to be set up in minutes (≈10–30), enabling quick deployment and improved customer service.
- Easy data export to support 7-day callout forecasting and better resource allocation.
- Responsive partner with quick training, fast support, and minor enhancements turned around quickly.
- Right-sized cost and rollout for a lean operation, with room to scale as the portfolio grows.
With those criteria met, Hart Lifts put FIELDBOSS to work—turning day‑one capabilities into practical wins across scheduling, onboarding, customer reporting, and resource planning.
THE RESULTS
Lean Scheduling
Rapid Onboarding
Photo-backed Reports
7-day Forecasting
Office Enablement
LOOKING AHEAD
With a planned upgrade on the roadmap, Hart Lifts aims to build on these gains by automating routine communication, enhancing customer self-service, and expanding analytics to support more proactive decision-making. The focus is on reducing manual administration, shortening feedback loops, and providing clients with clearer visibility on a day-to-day basis.
- Automate visit reports to eliminate manual sending and speed customer sign-off.
- Launch a client portal that allows customers to view their job status, download reports, and track their visit history.
- Publish monthly KPI dashboards (e.g., via Power BI) to surface trends and SLA performance at a glance.
- Tighten parts & purchasing traceability to accelerate PO lookups and standardize repeatpart workflows.
- Offer lifecycle & budget guidance on ageing equipment to inform modernization timing and capital planning.
With FIELDBOSS, Hart Lifts moved from an aging, office-bound system to a cloud platform that scales with the business. Scheduling is leaner, onboarding new sites takes minutes, and customers receive timely, photo-backed proof after every visit. These gains have increased throughput without adding headcount, improved customer confidence, and created a scalable foundation for continued growth across Hart’s 1,500lift portfolio.